全球經(jīng)典案例
Position Actuelle : Accueil > Exemples de Projets d'Ingénierie >
熱門產(chǎn)品
Hot Products
推薦新聞
Recent News
熱烈祝賀湛江偉達(dá)機(jī)械獲得...
喜訊!熱烈祝賀偉達(dá)機(jī)械獲...
坡頭區(qū)創(chuàng)新發(fā)展大會(huì)召開,...
“天然橡膠加工機(jī)械創(chuàng)新中...
賴偉平董事長(zhǎng)受邀到江蘇強(qiáng)...
廣饒國(guó)際橡膠輪胎暨汽車配...
An 8,400-ton Natural Rubber TSR20 Production Line in C?te d'Ivoire
Date: June 1, 2019
Engineering Project :
Natural Rubber TSR20 Production Line
Processing Materials :Natural Rubber, Cup Rubber
Annual Capacity :8400Tons
Finished Product :TSR 20
Year and Place :Cote d'Ivoire 2017
Matching Heat Source :Diesel Furnace
Cote d'Ivoire is the largest rubber plantation in Africa. Its rubber production accounts for 60% of Africa's total output, which ranking first in Africa and seventh in the world.
![](http://m.ly-23zx.com/wp-content/uploads/2024/11/ktdw_case_1.jpg)
The entire project process includes the following 8 items
Crepe dehydration - Shred - Dry - Package Creper - Hammer Mill Machine- Drying Line (including Fan, Drying Trolley, Embedded Parts, Thermal Insulation and Sealing Material, etc.) - Packing Machine
![](http://m.ly-23zx.com/wp-content/uploads/2024/11/ktdw_case_2-775x1024.jpg)
1. Less configurating equipment; 2. Low investment cost.
First time to join the rubber processing industry, do not want to invest many equipment or have the budget limit, could think about this production line proposal .
![](http://m.ly-23zx.com/wp-content/uploads/2024/11/ktdw_case_3-782x1024.jpg)